|
2001
|
2000
|
1999
|
1998
|
1997
|
1996
|
1995
|
1994
|
1990
|
1978
Click the links to go to documents. Click the green arrow to see metadata.
2001
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2001. Development and evaluation of passive integrated transponder tag technology: annual report, 1999 to 2000. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Contract 307-00001, Project No. 83-319, 31 p.
Downing, S. L., E. F. Prentice, R. W. Frazier, J. E. Simonson, E. P. Nunnallee. 2001. Technology developed for diverting passive integrated transponder (PIT) tagged fish at hydroelectric dams in the Columbia River Basin. Aquacultural Engineering, 25:149-164.
Top of Page
2000
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2000. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 29 p. plus appendix.
Flagg, T. A., T. E. Ruehle. (Eds.) 2000. Cle Elum Lake salmon restoration feasibility study: summary of research. Final Report to the Bonneville Power Administration, Contract 86-BP64840, 110 p.
Top of Page
1999
Marsh, D. M., G. M. Matthews, S. Achord, T. E. Ruehle, B. P. Sandford. 1999. Diversion of salmonid smolts tagged with passive integrated transponders from an untagged population passing through a juvenile collection system. North American Journal of Fisheries Management, 19:1142-1146.
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. W. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system (1997-98). Report to the Bonneville Power Administration, Contract 97-AI-31168, 41 p.
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 38 p. plus appendix.
Top of Page
1998
Nunnallee, E. P., E. F. Prentice, B. F. Jonasson, W. Patten. 1998. Evaluation of a flat-plate PIT tag interrogation system at Bonneville Dam. Aquacultural Engineering, 17:261-272.
Top of Page
1997
Smith, S. G., W. D. Muir, E. E. Hockersmith, S. Achord, M. B. Eppard, T. E. Ruehle, J. G. Williams, J. R. Skalski. 1997. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Draft Annual Report to the Bonneville Power Administration, Portland, OR, Contract DE-AI79-93BP10891, Project 93-29, and U.S. Army Corps of Engineers, Walla Walla, WA, Project E86940119, Contract DE-AI79-93BP10891.
Swan, G. A., M. B. Eppard, B. L. Iverson, M. A. Kaminski. 1997. Evaluation of the effectiveness of radio-telemetry methods to monitor passge routes of juvenile salmonids at Ice Harbor Dam, 1996. Report to the U.S. Army Corps of Engineers, Contract E86-95-0113, 33 p.
Swan, G. A., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, B. L. Iverson, P. A. Ocker, M. A. Kaminski, R. N. Iwamoto. 1997. Juvenile radio-telemetry study at Ice Harbor Dam, 1995. Report to the U.S. Army Corps of Engineers, Contract E86-95-0113, 34 p.
Top of Page
1996
Muir, W. D., S. G. Smith, E. E. Hockersmith, S. Achord, R. F. Absolon, P. A. Ocker, M. B. Eppard, T. E. Ruehle, J. G. Williams, R. N. Iwamoto, J. R. Skalski. 1996. Survival estimates for the passage of the yearling chinook salmon and steelhead through Snake River dams and reservoirs, 1995. Report to the Bonneville Power Administration, Contract E86940119, 88 p. plus appendices.
Sandford, B. P., T. E. Ruehle. 1996. Juvenile salmonid pit-tag studies at Prosser Dam and the Chandler Canal Fish Collection Facility, Yakima River, 1991 and 1992. Final. Report to the Bonneville Power Administration, Contract DE-AI79-90BP07099, 97 p.
Top of Page
1995
Muir, W. D., R. N. Iwamoto, C. R. Pasley, B. P. Sandford, P. A. Ocker, T. E. Ruehle. 1995. Relative survival of juvenile chinook salmon after passage through spillbays and the tailrace at Lower Monumental Dam, 1994. Report to the U.S. Army Corps of Engineers, Contract E86940101, 28 p.
Muir, W. D., S. G. Smith, R. N. Iwamoto, D. J. Kamikawa, K. W. McIntyre, E. E. Hockersmith, B. P. Sandford, P. A. Ocker, T. E. Ruehle, J. G. Williams, J. R. Skalski. 1995. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1994. Report to the Bonneville Power Administration, Contract DE-AI79-93BP10891, 187 p.
Stuehrenberg, L. C., G. A. Swan, L. K. Timme, P. A. Ocker, M. B. Eppard, R. N. Iwamoto, B. L. Iverson, B. P. Sandford. 1995. Migrational characteristics of adult spring, summer, and fall chinook salmon passing through reservoirs and dams of the Mid-Columbia River. Report to Mid-Columbia River Public Utility Districts, 132 p.
Top of Page
1994
Ruehle, T. E., C. S. McCutcheon. 1994. PIT-Tag studies with juvenile salmonids at the Chandler Canal Fish Collection Facility, Yakima River, 1990. Report to the Bonneville Power Administration, Contract DE-AI79-90BP07099, 37 p. plus appendices.
Swan, G. A., L. K. Timme, R. N. Iwamoto, L. C. Stuehrenberg, E. E. Hockersmith, B. L. Iverson, B. P. Sandford. 1994. Wells Dam radio-telemetry study, 1992. Public Utility District No. 1 of Douglas County, 70 p.
Top of Page
1990
Flagg, T. A., L. W. Harrell, T. E. Ruehle, J. L. Mighell. 1990. Results of the Yakima Sockeye Project, 1989-1990. Page 2 in Proceedings of the 1990 Alaska Department of Fish and Game Sockeye Culture Workshop, Anchorage, AK.
Top of Page
1978
Ruehle, T. E., C. Long, M. H. Gessel. 1978. Laboratory studies of a nontraveling bar screen for guiding juvenile salmonids out of turbine intakes. Report by Northwest and Alaska Fisheries Science Center, Division of Coastal Zone and Estuarine Studies to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-77-F-0071, 14 p.
Top of Page
|