|
July 2008
|
In press
|
2009
|
2008
|
2007
|
2006
|
2005
|
2004
|
2003
|
2002
2001
|
2000
|
1999
|
1998
|
1997
|
1996
|
1995
|
1994
|
1993
|
1991
1990
|
1989
|
1988
|
1987
|
1986
|
1985
|
1984
|
1983
|
1982
|
1979
1978
Click the links to go to documents. Click the green arrow to see metadata.
McComas, R. L., L. G. Gilbreath, S. G. Smith, G. M. Matthews, J. W. Ferguson, G. A. McMichael, J. A. Vucelick, T. Carlson. A study to estimate salmonid survival through the Columbia River estuary using acoustic tags, 2005. Report by NWFSC to the U.S. Army Corps of Engineers. Portland District, Contract E86910060, 45 p.
Top of Page
July 2008
Magie, R. J., A. S. Cameron, R. D. Ledgerwood, B. P. Sandford, G. M. Matthews. July 2008. Detection of PIT-Tagged Juvenile Salmonids in the Columbia River Estuary using Pair-Trawls, 2006. Report by NWFSC Fish Ecology to the US Army Corps of Engineers, North Pacific Division, Walla Walla District, Seattle, Contract 56ABNF100030, 70 p.
Magie, R. J., A. S. Cameron, R. D. Ledgerwood, B. P. Sandford, G. M. Matthews. July 2008. Development of Pair Trawl Detection Systems for Monitoring PIT-Tagged Juvenile Salmonids in the Columbia River Estuary, 2007. Report by NWFSC Fish Ecology to the US Department of Energy, Bonneville Power Administration, Seattle, Contract 36723, Project No. 199302900, 29 p.
Top of Page
In press
Enders, E. C., M. H. Gessel, J. G. Williams. In press. The behavioural response of downstream migrating fall Chinook salmon smolt to accelerating flows. Canadian Journal of Fisheries and Aquatic Sciences.
Wargo Rub, A. M., R. S. Brown, B. P. Sandford, K. A. Deters, L. G. Gilbreath, M. S. Myers, M. E. Peterson, R. A. Harnish, G. M. Matthews, I. W. Welch, D. W. Welch, J. A. Carter, J. W. Boyd, G. A. McMichael, E. E. Hockersmith. In press. Comparative performance of acoustic-tagged and passive integrated transponder-tagged juvenile salmonids in the Columbia and Snake Rivers, 2007. Report by NMFS/NWFSC to the U.S. Army Corps of Engineers. Portland District, Contract W66QKZ60441152, 161 p. DRAFT (Online Appendix: All Detections, Subyearling Chinook Salmon | Online Appendix: All Detections, Yearling Chinook Salmon | PDF)
Top of Page
2009
Magie, R. J., A. S. Cameron, R. D. Ledgerwood, B. P. Sandford, G. M. Matthews. 2009. Development of Pair Trawl Detection Systems for Monitoring PIT-Tagged Juvenile Salmonids in the Columbia River Estuary, 2007. Report by NWFSC Fish Ecology to the US Department of Energy, Bonneville Power Administration, Seattle, Contract 36723, Project No. 199302900, 29 p.
Magie, R. J., M. S. Morris, R. D. Ledgerwood, B. P. Sandford, G. M. Matthews. 2009. Pair-trawl detection of PIT-tagged juvenile salmonids migrating in the Columbia River estuary, 2008. Report by NWFSC to the Bonneville Power Administration, Contract 47035, Project No. 199302900.
Sebring, S. H., R. D. Ledgerwood, B. P. Sandford, A. Evans, G. M. Matthews. 2009. Detection of passive integrated transponder (PIT) tags on piscivorous avian colonies in the Columbia River Basin, 2007. Report by NWFSC to the U.S. Army Corps of Engineers, Walla Walla District, Contract 2RL4SPTP00.
Top of Page
2008
Kemp, P. S., M. H. Gessel, B. P. Sandford, J. G. Williams. 2008. Fish behaviour and passage efficiency: lessons from North America. Hydrobiologia, (609)205-217.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews, W. D. Muir. 2008. Transportation of juvenile salmonids on the Snake River, 2006: Final report for the 2003 wild spring/summer Chinook salmon juvenile migration. Report by NWFSC FED to the U.S. Army Corps of Engineers, Walla Walla District, Seattle, Contract E86960099, 48 p.
McComas, R. L., G. A. McMichael, J. A. Vucelick, L. G. Gilbreath, J. Everett, S. G. Smith, T. Carlson, G. M. Matthews, J. W. Ferguson. 2008. A study to estimate salmonid survival through the Columbia River estuary using acoustic tags, 2006. Report by NMFS/NWFSC to the U.S. Army Corps of Engineers. Portland District, Contract E86910060.
Ryan, B. A., M. C. Carper, B. P. Sandford, G. M. Matthews. 2008. Detection of passive integrated transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 2006. Report by National Marine Fisheries Service, NWFSC to the U.S. Army Corps of Engineers, Walla Walla District, Contract 2RL4SPTP00.
Top of Page
2007
Good, T. P., M. M. McClure, B. P. Sandford, K. Barnas, D. M. Marsh, B. A. Ryan, E. Casillas. 2007. Quantifying the effect of Caspian tern predation on endangered and threatened Pacific salmonids in the Columbia River. Endangered Species Research, 3:11-21.
Ledgerwood, R. D., A. S. Cameron, B. P. Sandford, L. B. Way, G. M. Matthews. 2007. Detection of PIT-tagged juvenile salmonids in the Columbia River estuary using pair-trawls, 2005. Report by National Marine Fisheries Service to the U.S. Army Corps of Engineers, Walla Walla District, Contract 56ABNF100030.
Top of Page
2006
Good, T. P., D. Harstad, C. Hall, C. Maranto, M. Harper, B. A. Ryan. 2006. Predation on juvenile salmonids by Caspian Terns nesting in Potholes Reservoir. In Appendix in Piscivorous Waterbird Research on the Columbia River: draft 2005 season summary.
Kemp, P. S., M. H. Gessel, B. P. Sandford, J. G. Williams. 2006. The behaviour of Pacific salmonid smolts during passage over two experimental weirs under light and dark conditions. River research and applications, 22:429-440.
Ryan, B. A., M. C. Carper, T. M. Gossen, M. G. Callaizakis, A. S. Cameron, E. P. Nunnallee, B. P. Sandford, G. M. Matthews. 2006. Detection of passive integrated transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 2003-2005. Report by National Marine Fisheries Service, NWFSC to the U.S. Army Corps of Engineers, Walla Walla District, Contract 2RL4SPTP00.
Top of Page
2005
Absolon, R. F., M. H. Gessel, B. P. Sandford, G. M. Matthews. 2005. Evaluation of fish condition with prototype vertical barrier screens at McNary Dam, 2004. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Walla Walla District, Contract W68SBV20655422, vi, 23 p.
Absolon, R. F., B. P. Sandford, M. B. Eppard, D. A. Brege, K. W. McIntyre, E. E. Hockersmith, G. M. Matthews. 2005. Relative survival estimates for PIT-tagged juvenile chinook salmon passing through turbines, collection channels, and spillways at Ice Harbor Dam, 2003. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Walla Walla District, Contract W68SBV92844866, v, 58 p.
Antolos, M., D. Roby, D. E. Lyons, K. Collis, A. F. Evans, M. Hawbecker, B. A. Ryan. 2005. Caspian tern predation on juvenile salmonids in the Mid-Columbia River. Transactions of the American Fisheries Society, 134:466-480.
Brege, D. A., L. G. Gilbreath, R. F. Absolon, B. P. Sandford, G. M. Matthews. 2005. Studies to evaluate the effectiveness of extended-length screens at John Day Dam, 2004. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Portland District, Contract W66QKZ90392273, vi, 40 p.
Ferguson, J. W., R. F. Absolon, T. Carlson, B. P. Sandford. 2005. Evidence of delayed mortality in juvenile Pacific salmon passing through turbines at Columbia River dams. Transactions of the American Fisheries Society, 135:139-150.
Ferguson, J. W., G. M. Matthews, R. L. McComas, R. F. Absolon, D. A. Brege, M. H. Gessel, L. G. Gilbreath. 2005. Passage of adult and juvenile salmonids through Federal Columbia River Power System dams. U.S. Dept. of Commerce, NOAA Tech. Memo., NMFS-NWFSC-64, 160 p.
Gessel, M. H., R. L. McComas, G. M. Matthews. 2005. Studies to establish biological design criteria for fish passage facilities: separation by size of juvenile salmonids using a high-velocity flume at Ice Harbor Dam in 2004. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Walla Walla District, Contract W68SBV00358064, vi, 18 p.
Good, T. P., K. Barnas, D. M. Marsh, M. M. McClure, B. A. Ryan, B. P. Sandford, E. Casillas. 2005. Caspian Tern Predation on Juvenile Salmonid Outmigrants in the Columbia River Estuary. In Caspian Tern Management to Reduce Predation of Juvenile Salmonids in the Columbia River Estuary. U.S. Fish and Wildlife Service Migratory Birds and Habitat Programs, Portland, OR.
Kemp, P. S., M. H. Gessel, J. G. Williams. 2005. Fine-scale behavioral responses of Pacific salmonid smolts as they encounter divergence and acceleration of flow. Transactions of the American Fisheries Society, 134:390-398.
Kemp, P. S., M. H. Gessel, J. G. Williams. 2005. Seaward migrating subyearling chinook salmon avoid overhead cover. Journal of Fish Biology, 67:1381-1391.
Ledgerwood, R. D., L. B. Way, A. S. Cameron, B. A. Ryan, B. P. Sandford, G. M. Matthews. 2005. Detection of PIT-tagged juvenile salmonids in the Columbia River estuary using pair-trawls, 2002. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Walla Walla District, Project No. 56ABNF100030, viii, 78 p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2005. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 2001: final report for the 2001 spring/summer chinook salmon juvenile migration. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District, Delivery Order E86960099, v, 20 p.
McComas, R. L., D. A. Frost, S. G. Smith, J. W. Ferguson, T. J. Carlson, T. Aboellail. 2005. A study to estimate salmonid survival through the Columbia River estuary using acoustic tags, 2002. Contract by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Portland District, Seattle, Contract E86910060, 84 p.
Ryan, B. A., A. S. Cameron, E. P. Nunnallee, J. W. Ferguson. 2005. Detection of Passive Integrated Transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 2002. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers. Walla Walla District, Contract 2RL4SPTP00.
Top of Page
2004
Achord, S., R. A. McNatt, E. E. Hockersmith, B. P. Sandford, K. W. McIntyre, N. N. Paasch, J. G. Williams, G. M. Matthews. 2004. Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Smolts, 2003. Report to the Bonneville Power Administration, Contract 00005619, 107 electronic pages.
Brege, D. A., R. F. Absolon, B. P. Sandford, J. W. Ferguson. 2004. Evaluation of extended-length submersible bar screens at John Day Dam, 2002. Report by Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Portland District, vi, 53 p.
Gessel, M. H., B. P. Sandford, J. W. Ferguson. 2004. Studies to establish biological design criteria for fish passage facilities: prototype testing of a cylindrical dewatering screen at McNary Dam 2001-2002. Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers Walla Walla District, vi, 19 p p. (PDF | Video files index page)
Gilbreath, L. G., E. F. Prentice, S. L. Downing. 2004. Post-construction evaluation of the juvenile bypass collection channel, transportation flume, and fish-monitoring facilities at Bonneville Dam second powerhouse, 1999-2000. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Portland District, Contract W66QKZ90281485.
Harmon, J. R., N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2004. Transportation of juvenile salmonids on the Columbia and Snake Rivers, 2003: Final report for 2000 spring/summer chinook slamon. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District.
Ledgerwood, R. D., B. A. Ryan, E. M. Dawley, E. P. Nunnallee, J. W. Ferguson. 2004. A surface trawl to detect migrating juvenile Salmonids tagged with passive integrated transponder tags. North American Journal of Fisheries Management, 24:440-451.
Ledgerwood, R. D., S. W. Naman, B. A. Ryan, B. P. Sandford, C. Z. Banks, J. W. Ferguson. 2004. Detection of PIT-tagged juvenile salmonids in the Columbia River estuary using a pair-trawl, 2000 and 2001. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV80622741, viii, 103 p. (PDF | HTML)
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2004. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 2002. Report of research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers Walla Walla District, v, 42 p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2004. Transportation of juvenile salmonids on the Columbia and Snake Rivers, 2003: Final report for 2000 and 2001 steelhead juveniles. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District, Delivery Order E86960099, vi, 57 p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2004. Transportation of juvenile salmonids on the Columbia and Snake Rivers, 2003: final adult returns for wild yearling chinook salmon migrating in 2000. Report of research by Fish Ecology Division, Northwest Fisheries Science Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract E86960099, vi, 48 p. (PDF | HTML)
Monk, B. H., B. P. Sandford, D. A. Brege, J. W. Ferguson. 2004. Evaluation of turbine intake modifications at Bonneville Dam second powerhouse, 2002. Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Portland, OR, vi, 48 p p.
Top of Page
2003
Absolon, R. F., D. A. Brege. 2003. Canister for releasing marked fish at depth in hydroelectric dam gatewells and forebays. North American Journal of Fisheries Management, 23:605-610.
Absolon, R. F., M. B. Eppard, B. P. Sandford, G. A. Axel, E. E. Hockersmith, J. W. Ferguson. 2003. Effects of turbines operating at two different discharge levels on survival and condition of yearling chinook salmon at McNary Dam, 2002. Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District, v, 20 p.
Achord, S., E. E. Hockersmith, B. P. Sandford, R. A. McNatt, B. E. Feist, G. M. Matthews. 2003. Monitoring the Migrations of Wild Snake River Spring/Summer Chinook Salmon Smolts, 2002. Report to the Bonneville Power Administration, Contract 00005619, 95 electronic pages. (BPA Report DOE/BP-1991-028-00)
Glabek, J. H., B. A. Ryan, E. P. Nunnallee, J. W. Ferguson. 2003. Detection of Passive Integrated Transponder (PIT) Tags on Piscivorous Bird Colonies in the Columbia River Basin, 2001. Report to the U.S. Army Corps of Engineers, Walla Walla District, Delivery Order 2RL4SPTP00. (PDF | HTML)
Ledgerwood, R. D., B. A. Ryan, C. Z. Banks, E. P. Nunallee, B. P. Sandford, S. G. Smith, J. W. Ferguson. 2003. Detection of PIT-tagged juvenile salmonids in the Columbia River estuary using a surface-trawl detection system, 1999. Report of Research, Fish Ecology Division, Northwest Fisheries Science Center, v, 66 p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2003. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 2001. Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District, v, 38 p.
McComas, R. L., B. P. Sandford, C. D. Magie, J. W. Ferguson. 2003. Biological design criteria for fish passage facilities: high-velocity flume development and improved wet-separator efficiency McNary Dam, 1999. Report to the U.S. Army Corps of Engineers, Walla Walla District, Delivery Order E86910060, 24 p. plus appendices.
McComas, R. L., B. P. Sandford, C. D. Magie, J. W. Ferguson, D. M. Katz, M. Plummer. 2003. Evaluation of a prototype high-velocity flume separator at Ice Harbor Dam, 1999. Report of Research by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Walla Walla District, vi, 76 p.
Ryan, B. A., S. G. Smith, J. M. Butzerin, J. W. Ferguson. 2003. Relative vulnerability to avian predation of juvenile salmonids tagged with passive integrated transponders in the Columbia River estuary, 1998-2000. Transactions of the American Fisheries Society, 132:275-288.
Ryan, B. A., S. G. Smith, J. M. Butzerin, J. W. Ferguson. 2003. Vulnerability of PIT-tagged juvenile. Transactions of the American Fisheries Society, 132:275-288.
Top of Page
2002
Absolon, R. F., E. M. Dawley, B. P. Sandford, J. W. Ferguson, D. A. Brege. 2002. Relative survival of juvenile salmon passing through the spillway of The Dalles Dam, 1997-2000. Report of Research, Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, ix, 150 p.
Achord, S., G. A. Axel, E. E. Hockersmith, B. P. Sandford, M. B. Eppard, G. M. Matthews. 2002. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 2001. Report by National Marine Fisheries Service to the U.S. Department of Energy, Bonneville Power Administration, Portland, Oregon.
Dawley, E. M., R. D. Ledgerwood, T. H. Blahm, C. W. Sims, J. T. Durkin, R. A. Rica, A. E. Rankis, G. E. Mohan, F. J. Ossiander. 2002. Migrational characteristics, biological observations, and relative survival of juvenile salmonids entering the Columbia River estuary, 1966-1983. Report to the Bonneville Power Administration. The publication date is April 1986
Monk, B. H., R. F. Absolon, B. P. Sandford, J. W. Ferguson. 2002. Evaluation of intake modifications at Bonneville Dam second powerhouse, 2001. Report of Research, Fish Ecology Division, Northwest Fisheries Science Center, v, 40 p.
Ryan, B. A., C. Z. Banks, E. P. Nunnallee, R. D. Ledgerwood, J. W. Ferguson. 2002. Detection of passive integrated transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 1998 and 1999. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV806ZZ741, iii, 15 p.
Ryan, B. A., J. H. Glabek, J. W. Ferguson, E. P. Nunnallee, R. D. Ledgerwood. 2002. Detection of passive integrated transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 2000. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV806ZZ741, v, 78 p.
Ryan, B. A., J. H. Glabek, J. W. Ferguson, E. P. Nunnallee, R. D. Ledgerwood. 2002. Detection of passive integrated transponder tags on piscivorous birds colonies in the Columbia River Basin, 2000. Report by National Marine Fisheries Service to the U.S. Army Corps of Engineers, Walla Walla, Washington.
Top of Page
2001
Achord, S., G. A. Axel, E. E. Hockersmith, B. P. Sandford, M. B. Eppard, G. M. Matthews. 2001. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1999. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Project 91028, Contract 99-AI-19164, 38 p. plus appendix.
Achord, S., G. A. Axel, E. E. Hockersmith, B. P. Sandford, M. B. Eppard, G. M. Matthews. 2001. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 2000. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Contract 99-AI-19164, Project No. 9102800, 45 p. plus appendices.
Brege, D. A., J. W. Ferguson, R. F. Absolon, B. P. Sandford. 2001. Evaluation of extended-length bypass screens at John Day Dam, 1999. Report to the U.S. Army Corps of Engineers, Portland District, Contract W66QKZ90392273, 21 p. plus appendices.
Brege, D. A., M. H. Gessel, R. F. Absolon, B. P. Sandford, J. W. Ferguson. 2001. Studies to evaluate the effectiveness of outlet flow-control and debris control devices at McNary and Little Goose Dams, 1998. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract E86970083, 16 p. plus appendices.
Collis, K., D. Roby, B. A. Ryan, R. D. Ledgerwood. 2001. Colonial Waterbird Predation on Juvenile Salmonids Tagged with Passive Integrated Transponders in the Columbia River Estuary: Vulnerability of Different Salmonid Species, Stocks, and Rearing Types. Transactions of the American Fisheries Society, 130:385-396.
Gessel, M. H., J. W. Ferguson. 2001. Evaluation of a high-velocity induction/release system for testing turbine-related injuries to juvenile salmonids at hydroelectric projects. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV82443526, 7 p. plus appendix.
Ledgerwood, R. D., B. A. Ryan, R. N. Iwamoto. 2001. Estuarine and nearshore-ocean acoustic tracking of juvenile spring chinook salmon from the Columbia River. Pages 245-255 in Moore, A., I. Russell. (Eds.) Advances in fish telemetry: proceedings of the 3rd conference on fish telemetry in Europe, June 20-25, 1999, Norwich, UK. Centre for Environment, Fisheries, and Aquaculture Science, Lowestoft, UK.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2001. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 2000. Annual report of research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 27 p. plus appendix.
McComas, R. L., M. H. Gessel, B. P. Sandford, D. B. Dey. 2001. Biological design criteria for juvenile fish passage, 1998: high-velocity flume development and improved wet-separator efficiency. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract E86910060, 33 p. plus appendix.
Ryan, B. A., C. Z. Banks, E. P. Nunnallee, R. D. Ledgerwood, J. W. Ferguson. 2001. Detection of passive integrated transponder (PIT) tags on piscivorous bird colonies in the Columbia River Basin, 1998 and 1999. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV806ZZ741, 13 p.
Ryan, B. A., J. W. Ferguson, R. D. Ledgerwood, E. P. Nunnallee. 2001. Detection of passive integrated transponder tags from juvenile salmonids on piscivorous bird colonies in the Columbia River Basin. North American Journal of Fisheries Management, 21:417-421.
Top of Page
2000
Absolon, R. F., D. A. Brege, J. W. Ferguson. 2000. Post-construction evaluation of the juvenile bypass system at John Day Dam, 1999. Report to the U.S. Army Corps of Engineers, Contract W66QKZ80354028, 14 p.
Absolon, R. F., B. P. Sandford, D. B. Dey. 2000. Post-construction evaluation of the new juvenile bypass system and guidance screen modifications at John Day Dam, 1998. Report to the U.S. Army Corps of Engineers, Contract W66QKZ80354028, 34 p. plus appendices.
Achord, S., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, G. A. Axel, G. M. Matthews. 2000. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts in the Columbia River Basin, USA. In International Congress of Fish Biology, Symposium Proceedings, July 23-27, 2000, Aberdeen, Scotland.
Achord, S., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, G. A. Axel, G. M. Matthews. 2000. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1998. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Contract DE-AI79-91BP18800, Project No. 9102800, 38 p. plus appendix.
Dawley, E. M., L. G. Gilbreath, R. F. Absolon, B. P. Sandford, J. W. Ferguson. 2000. Relative survival of juvenile salmon passing through the spillway and the ice trash sluiceway of The Dalles Dam, 1998. Report to the U.S. Army Corps of Engineers, Contract MIPR E96970020, W66QKZ82167243 and W66QKZ83437725, 47 p. plus appendices.
Dawley, E. M., C. J. Ebel, R. F. Absolon, B. P. Sandford, J. W. Ferguson. 2000. Relative survival of juvenile salmon passing through the spillway of The Dalles Dam, 1999. Report to the U.S. Army Corps of Engineers, Portland District, Contract W66QKZ83437725, 42 p. plus appendices.
Gessel, M. H., B. H. Monk, B. P. Sandford, J. W. Ferguson. 2000. Evaluation of a chamfered perforated plate for extended-length bar screens at Little Goose and McNary Dams, 1999. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV80210987, 10 p. plus appendix.
Gessel, M. H., B. P. Sandford, J. W. Ferguson. 2000. Evaluation of the effectiveness of an orifice shelter at McNary Dam, Columbia River, 1999. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV80210987, 10 p. plus appendix.
Gilbreath, L. G., D. Smith, R. D. Ledgerwood, S. S. Pool, S. J. Grabowski. 2000. Limnological investigations in John Day reservoir including selected upper reservoir habitats, April 1994 to September 1995. Report to the U.S. Army Corps of Engineers, Contract W66QKZ833356795, 152 p.
Harmon, J. R., D. M. Marsh, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2000. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1999. Annual report of research to the U.S. Army Corps of Engineers, 28 p. plus appendix.
Ledgerwood, R. D., B. A. Ryan, R. N. Iwamoto. 2000. Estuarine and nearshore-ocean sonic tracking of juvenile spring chinook salmon from the Columbia River. In Proceedings of the 3rd conference on fish telemetry in Europe, June 20-25, 1999, Norwich, UK. Centre for Environment, Fisheries, and Aquaculture Science, Lowestoft, UK.
Ledgerwood, R. D., B. A. Ryan, E. P. Nunnallee, J. W. Ferguson. 2000. Estuarine recovery of PIT-tagged salmonids from the Lower Granite Dam transportation study, 1998. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract E8960100, 50 p. plus appendices.
Ledgerwood, R. D., S. S. Pool, L. G. Gilbreath, S. J. Grabowski, D. Smith. 2000. Limnology of selected shallow-water habitats in Lower Granite reservoir, 1994-95. Report to the U.S. Army Corps of Engineers, Contract E86940115, 46 p. plus appendices.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 2000. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1998. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract 68-84-H0034, 34 p. plus appendix.
McComas, R. L., M. H. Gessel, B. P. Sandford, D. B. Dey, D. M. Katz. 2000. Biological design criteria for improved wet-separator efficiency and high-velocity flume development, 1997. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract E86910060, 22 p. plus appendices.
Ryan, B. A., E. M. Dawley, R. A. Nelson. 2000. Modeling the effects of dissolved gas supersaturation on resident aquatic biota in the mainstem Snake and Columbia Rivers. North American Journal of Fisheries Management, 20:192-204.
Ryan, B. A., E. M. Dawley, R. A. Nelson. 2000. Modeling the effects of supersaturated dissolved gas on resident aquatic biota in the main-stem Snake and Columbia Rivers. North American Journal of Fisheries Management, 20:192-204.
Top of Page
1999
Absolon, R. F., E. M. Dawley, B. P. Sandford. 1999. Changes in gas bubble disease signs of migrating juvenile salmonids experimentally exposed to supersaturated gasses, 1997. Report to the Bonneville Power Administration, Contract 96-BI-93892, 16 p.
Brege, D. A., M. H. Gessel, R. F. Absolon, B. P. Sandford, J. W. Ferguson. 1999. Studies to evaluate the effectiveness of outlet flow-control and debris control devices at McNary and Little Goose Dams, 1998. Report to the U.S. Army Corps of Engineers, Contract E86970083, 20 p. plus appendices.
Marsh, D. M., G. M. Matthews, S. Achord, T. E. Ruehle, B. P. Sandford. 1999. Diversion of salmonid smolts tagged with passive integrated transponders from an untagged population passing through a juvenile collection system. North American Journal of Fisheries Management, 19:1142-1146.
Matthews, G. M. 1999. Truck transportation of juvenile salmonids at U.S. Army Corps of Engineers Dams. National Marine Fisheries Service, Northwest Fisheries Science Center, Seattle, Washington, 29 p.
Monk, B. H., M. H. Gessel, J. W. Ferguson. 1999. An evaluation of the biological database for improving fish guidance efficiency at Bonneville Dam Second Powerhouse. Report to the U.S. Army Corps of Engineers, Contract W66QKZ90059456, 62 p.
Top of Page
1998
Achord, S., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, G. M. Matthews. 1998. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1997. Report to the Bonneville Power Administration, Contract DE-AI79-91BP18800, 78 p.
Dawley, E. M., L. G. Gilbreath, R. D. Ledgerwood, P. J. Bentley, B. P. Sandford. 1998. Effects of bypass systems at Bonneville Dam Second Powerhouse on downstream migrant salmon and steelhead; direct capture assessment, 1990-1992. Final report of research by Fish Ecology Division, Northwest Fisheries Science Center to the U.S. Army Corps of Engineers, Contract DACW57-85-H-0001, 53 p. plus appendices.
Eppard, M. B., G. A. Axel, B. P. Sandford, G. M. Matthews. 1998. Ice Harbor Dam spill efficiency determined by radio telemetry, 1997. Report of research to the U.S. Army Corps of Engineers, Walla Walla District, Delivery Order E86970079, 23 p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 1998. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1997. Annual report of research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 17 p. plus appendix.
McComas, R. L., M. H. Gessel, B. P. Sandford, D. B. Dey. 1998. Studies to establish biological design criteria for wet separators, 1996. Report to the U.S. Army Corps of Engineers, Contract E86910060, 44 p.
Ryan, B. A., E. M. Dawley. 1998. Effects of dissolved gas supersaturation on fish residing in the Snake and Columbia rivers, 1997. Report to the Bonneville Power Administration, Contract 96-BI-93605, 50 p.
Top of Page
1997
Achord, S., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, G. M. Matthews. 1997. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1996. Report to the Bonneville Power Administration, Contract DE-AI79-91BP18800, Project No. 91-28, 74 p.
Brege, D. A., R. F. Absolon, B. P. Sandford, D. B. Dey. 1997. Studies to evaluate the effectiveness of extended-length screens at John Day Dam, 1996. Report to the U.S. Army Corps of Engineers, Contract E96960028, 41 p.
Brege, D. A., R. F. Absolon, B. P. Sandford, D. B. Dey. 1997. Studies to evaluate the effectiveness of extended-length screens at The Dalles Dam, 1995. Report to the U.S. Army Corps of Engineers, Contract E96930030, 24 p. plus appendices.
Chapman, D., C. Carlson, D. Weitkamp, G. M. Matthews, J. Stevenson, M. Miller. 1997. Homing in sockeye and chinook salmon transported around part of their smolt migration route in the Columbia River. North American Journal of Fisheries Management, 17:101-113.
Elliott, D. G., R. J. Pascho, L. M. Jackson, G. M. Matthews, J. R. Harmon. 1997. Renibacterium salmoninarum in spring-summer chinook salmon smolts at dams on the Columbia and Snake Rivers. Journal of Aquatic Animal Health, 9:114-126.
Gessel, M. H., B. P. Sandford, D. B. Dey. 1997. Post-construction evaluation of the juvenile salmonid bypass system at Ice Harbor Dam, 1996. Report to the U.S. Army Corps of Engineers, Contract E86960098, 20 p.
Ledgerwood, R. D., E. M. Dawley, B. W. Peterson, R. N. Iwamoto. 1997. Estuarine recovery of PIT-tagged juvenile salmonids from the Lower Granite Dam transportation study, 1996. Report to the U.S. Army Corps of Engineers, Contract E8960100, 54 pgs. plus appendice p.
Marsh, D. M., J. R. Harmon, N. N. Paasch, K. L. Thomas, K. W. McIntyre, B. P. Sandford, G. M. Matthews. 1997. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1996. Annual report of research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 26 p. plus appendix.
Matthews, G. M., N. N. Paasch, S. Achord, K. W. McIntyre, J. R. Harmon. 1997. A technique to minimize the adverse ettects associated with handling and marking salmonid smolts. Progressive Fish-Culturist, 59:307-309.
McComas, R. L., B. P. Sandford, D. B. Dey. 1997. Descaling and orifice passage efficiency studies at McNary Dam, 1995. Report to the U.S. Army Corps of Engineers, Contract E86910060, 35 p.
Pool, S. S., R. D. Ledgerwood. 1997. Benthic invertebrates in soft-substrate, shallow-water habitats in Lower Granite Reservoir, 1994-95. Report to the U.S. Army Corps of Engineers, Contract E86940115, 96 p.
Shrank, B. P., E. M. Dawley, B. A. Ryan. 1997. Evaluation of the effects of dissolved gas supersaturation on fish and invertebrates in Priest Rapids Reservoir, and downstream from Bonneville and Ice Harbor Dams, 1995. Report to the U.S. Army Corps of Engineers, Contract E96940029, 45 p.
Top of Page
1996
Achord, S., M. B. Eppard, B. P. Sandford, G. M. Matthews. 1996. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1995. Report to the Bonneville Power Administration, Contract DE-A179-91BP18800, Project No. 91-028, 179 p.
Achord, S., G. M. Matthews, O. W. Johnson, D. M. Marsh. 1996. Use of passive integrated transponder (PIT) tags to monitor migration timing of Snake River chinook salmon smolts. North American Journal of Fisheries Management, 16:302-313.
Brege, D. A., R. F. Absolon, R. J. Graves. 1996. Seasonal and diel passage of juvenile salmonids at John Day Dam on the Columbia River. North American Journal of Fisheries Management, 16(3):659-665.
Gessel, M. H., B. P. Sandford, D. B. Dey. 1996. Studies to evaluate the effectiveness of extended-length screens at Little Goose Dam, 1995. Annual Report to the U.S. Army Corps of Engineers, Delivery Order E86920164, 17 p.
Harmon, J. R., N. N. Paasch, K. W. McIntyre, K. L. Thomas, B. P. Sandford, G. M. Matthews. 1996. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1994. Annual report of research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 18 p. plus appendix.
Marsh, D. M., L. K. Timme, B. P. Sandford, S. Achord, G. M. Matthews. 1996. Preliminary evaluation of the new juvenile collection, bypass, and sampling facilities at Lower Monumental Dam, 1994. Report of Research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 54 p.
Marsh, D. M., B. H. Monk, B. P. Sandford, G. M. Matthews. 1996. Preliminary evaluation of the new juvenile collection, bypass, and sampling facilities at McNary Dam, 1994. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract DACW68-84-H-0034, 39 p. plus appendix.
Marsh, D. M., J. R. Harmon, K. W. McIntyre, K. L. Thomas, N. N. Paasch, B. P. Sandford, D. J. Kamikawa, G. M. Matthews. 1996. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1995. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract DACW68-84-H-0034, 43 p. plus appendix.
Muir, W. D., S. G. Smith, E. E. Hockersmith, S. Achord, R. F. Absolon, P. A. Ocker, M. B. Eppard, T. E. Ruehle, J. G. Williams, R. N. Iwamoto, J. R. Skalski. 1996. Survival estimates for the passage of the yearling chinook salmon and steelhead through Snake River dams and reservoirs, 1995. Report to the Bonneville Power Administration, Contract E86940119, 88 p. plus appendices.
Williams, J. G., M. H. Gessel, B. P. Sandford, J. J. Vella. 1996. Evaluation of factors affecting juvenile chinook salmon fish guidance efficiency. Report to the U.S. Army Corps of Engineers, Project No. E86910059, 35 p.
Top of Page
1995
Absolon, R. F., D. A. Brege, B. P. Sandford, D. B. Dey. 1995. Studies to evaluate the effectiveness of extended-length screens at The Dalles Dam, 1994. Report to the U.S. Army Corps of Engineers, Contract E96930030, 69 p.
Achord, S., D. J. Kamikawa, B. P. Sandford, G. M. Matthews. 1995. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1993. Report to the Bonneville Power Administration, Contract 91BP18800, Project No. 91-28, 88 p.
Achord, S., D. J. Kamikawa, B. P. Sandford, G. M. Matthews. 1995. Monitoring the migrations of wild Snake River spring/summer chinook salmon smolts, 1994. Report to the Bonneville Power Administration, Contract DE-A179-91BP18800, Project No. 91-028, 100 p.
Achord, S., D. J. Kamikawa, B. P. Sandford, G. M. Matthews. 1995. Monitoring the smolt migrations of wild Snake River spring/summer chinook salmon smolts, 1993. Report to the Bonneville Power Administration, Contract 91BP18800, Project No. 91-28, 88 p.
Gessel, M. H., B. P. Sandford, D. B. Dey. 1995. Studies to evaluate the effectiveness of extended-length screens at Little Goose Dam, 1994. Report to the U.S. Army Corps of Engineers, Contract E86920164, 33 p.
Harmon, J. R., D. J. Kamikawa, B. P. Sandford, K. W. McIntyre, K. L. Thomas, N. N. Paasch, G. M. Matthews. 1995. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1993. Report to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 37 p. plus appendices.
Marsh, D. M., B. P. Sandford, G. M. Matthews. 1995. Preliminary evaluation of the new collection, bypass, and sampling facilities at Lower Monumental Dam, 1993. Annual report of research to the U.S. Army Corps of Engineers, Contract DACW68-84-H-0034, 48 p. plus appendix.
McComas, R. L., B. P. Sandford, D. B. Dey. 1995. Vertical barrier screen studies at McNary Dam, 1994. Report to the U.S. Army Corps of Engineers, Contract E86910060, 103 p.
Toner, M. A., B. A. Ryan, E. M. Dawley. 1995. Evaluation of the effects of dissolved gas supersaturation on fish and invertebrates downstream from Bonneville, Ice Harbor, and Priest Rapids Dams, 1994. Report to the U.S. Army Corps of Engineers, Contract E96940029, 38 p.
Waknitz, F. W., G. M. Matthews, T. C. Wainwright, G. A. Winans. 1995. Status review for mid- Columbia River summer chinook salmon. U.S. Dept. of Commerce, NOAA Tech. Memo., NMFS-NWFSC-22, 80 p.
Williams, J. G., G. M. Matthews. 1995. A review of flow and survival relationships for spring and summer chinook salmon, Oncorhynchus tshawytscha, from the Snake River Basin. Fishery Bulletin, 93:732-740.
Top of Page
1994
Achord, S., G. M. Matthews, D. M. Marsh, B. P. Sandford, D. J. Kamikawa. 1994. Monitoring the migrations of wild Snake River spring and summer chinook salmon smolts, 1992. Report to the Bonneville Power Administration, Contract DE-AI79-91BP18800, 73 p.
Brege, D. A., R. F. Absolon, B. P. Sandford, D. B. Dey. 1994. Studies to evaluate the effectiveness of extended-length screens at The Dalles Dam, 1993. Report to the U.S. Army Corps of Engineers, Contract E96930030, 72 p.
Gessel, M. H., B. P. Sandford, B. H. Monk, D. A. Brege. 1994. Population Estimates of Northern Squawfish, Ptychocheilus oregonensis, at Bonneville Dam First Powerhouse, Columbia River. U.S. Dept. of Commerce, NOAA Tech. Memo., NMFS-NWFSC-18, 21 p.
Gessel, M. H., B. P. Sandford, D. B. Dey. 1994. Studies to evaluate the effectiveness of extended-length screens at Little Goose Dam, 1993. Report to the U.S. Army Corps of Engineers, Delivery Order E86920164, 42 p.
Giorgi, A. E., D. R. Miller, B. P. Sandford. 1994. Migratory characteristics of ocean-type chinook salmon, Oncorhynchus tshawytscha, in John Day Reservoir on the Columbia River. Fishery Bulletin, 92:872-879.
Ledgerwood, R. D., E. M. Dawley, L. G. Gilbreath, L. T. Parker, B. P. Sandford, S. J. Grabowski. 1994. Relative survival of subyearling chinook salmon after passage through the bypass system at the first powerhouse or a turbine at the first or second powerhouse and through the tailrace basins at Bonneville Dam, 1992. Coastal Zone and Estuarine Studies Division, Northwest Fisheries Science Center, Seattle, WA, ii, 83 p.
McComas, R. L., B. P. Sandford, D. B. Dey. 1994. Studies to evaluate the effectiveness of extended-length screens at McNary Dam, 1993. Report to the U.S. Army Corps of Engineers, 109 p.
Williams, J. G., M. H. Gessel. 1994. Fish diversion and screening devices: Is there a relationship to fish behavior? Pages 135-140 in Proceedings of the Symposium on Fish Passage Policy and Technology, 1-2 September 1993, Portland, OR. Am. Fish Soc., Bioeng. Sec, Bethesda, MD.
Top of Page
1993
Gessel, M. H., W. D. Muir, B. P. Sandford, D. B. Dey. 1993. Evaluation of the new juvenile salmonid bypass system at Lower Monumental Dam, 1992. Report to the U.S. Army Corps of Engineers, Contract E86920053, 23 p.
Gilbreath, L. G., E. M. Dawley, R. D. Ledgerwood, P. J. Bentley, S. J. Grabowski. 1993. Relative survival of subyearling chinook salmon that have passed Bonneville Dam via the spillway or second powerhouse turbines or bypass system: adult recoveries through 1991. Report to the U.S. Army Corps of Engineers, Contract E96910013, 26 p.
Harmon, J. R., B. P. Sandford, K. L. Thomas, N. N. Paasch, K. W. McIntyre, G. M. Matthews. 1993. Research related to transportation of juvenile salmonids on the Columbia and Snake Rivers, 1992. Annual Report to the U.S. Army Corps of Engineers, Contract DACW68-84-H0034, 25 p. plus appendices (162 p.).
Ledgerwood, R. D., E. M. Dawley, P. J. Bentley, L. G. Gilbreath, T. P. Poe, H. L. HANSEN. 1993. Effectiveness of predator removal for protecting juvenile fall chinook salmon released from Bonneville Hatchery, 1991. U.S. Dept. of Commerce, NOAA Tech. Memo., NMFS-NWFSC-9, 63 p.
McComas, R. L., D. A. Brege, W. D. Muir, B. P. Sandford, D. B. Dey. 1993. Studies to determine the effectiveness of extended-length submersible bar screens at McNary Dam, 1992. Report to the U.S. Army Corp of Engineers, Delivery Order E86910060, 85 p.
Top of Page
1991
Gessel, M. H., J. G. Williams, D. A. Brege, R. Krcma, D. R. Chambers. 1991. Juvenile salmonid guidance at the Bonneville Dam Second Powerhouse, Columbia River, 1983-1989. North American Journal of Fisheries Management, 11:400-412.
Matthews, G. M., R. S. Waples. 1991. Status Review for Snake River Spring and Summer Chinook Salmon. U.S. Dept. of Commerce, NOAA Tech. Memo., NMFS-F/NWC-200.
Top of Page
1990
Gessel, M. H., D. A. Brege, B. H. Monk, J. G. Williams. 1990. Continued studies to evaluate the juvenile bypass systems at Bonneville Dam - 1989. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Science Center to the U.S. Army Corps of Engineers, Portland District, Seattle, WA, Contract DACW77-88-F-9999, 34 p.
Top of Page
1989
Gessel, M. H., B. H. Monk, D. A. Brege, J. G. Williams. 1989. Fish guidance efficiency studies at Bonneville First and Second Powerhouses, 1988. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Science Center to the U.S. Army Corps of Engineers, Seattle, WA, Delivery Order DACW57-87-F-0322, 36 p.
Top of Page
1988
Gessel, M. H., B. H. Monk, J. G. Williams. 1988. Evaluation of the juvenile fish collection and bypass systems at Bonneville Dam - 1987. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Science Center to the U.S. Army Corps of Engineers, Contract DACW57-87-F-0322, 131 p.
Williams, J. G., M. H. Gessel, D. R. Chambers. 1988. Juvenile salmonid bypass system research at Bonneville Second Powerhouse, Columbia River. Pages [1-41]-[1-54] in Proceedings: Fish protection at steam and hydroelectric power plants. Electric Power Research Institute, Palo Alto, CA.
Top of Page
1987
Gessel, M. H., L. G. Gilbreath, W. D. Muir, B. H. Monk, R. Krcma. 1987. Evaluation of the juvenile salmonid collection and bypass systems at Bonneville Dam - 1986. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-86-F-0270, 53 p.
Monk, B. H., W. D. Muir, M. H. Gessel. 1987. Studies to evaluate alternative methods of bypassing juvenile fish at the Dalles Dam, 1986. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-85-H-0295, 16 p.
Top of Page
1986
Dawley, E. M., R. D. Ledgerwood, T. H. Blahm, C. W. Sims, J. T. Durkin, R. A. Rica, A. E. Rankis, G. E. Mohan, F. J. Ossiander. 1986. Migrational characteristics, biological observations, and relative survival of juvenile salmonids entering the Columbia River estuary, 1966-1983..
Gessel, M. H., L. G. Gilbreath, W. D. Muir, R. Krcma. 1986. Evaluation of the juvenile collection and bypass systems at Bonneville Dam - 1985. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-85-H-0001, 63 p.
Top of Page
1985
Gessel, M. H., R. Krcma, W. D. Muir, C. S. McCutcheon, L. G. Gilbreath, B. H. Monk. 1985. Evaluation of the juvenile collection and bypass system at Bonneville Dam, 1984. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-84-F-0181, 48 p.
Gessel, M. H., W. Farr, C. Long. 1985. Underwater separation of juvenile salmonids by size. Marine Fisheries Review, 47(3):38-42.
Top of Page
1984
Krcma, R., M. H. Gessel, W. D. Muir, C. S. McCutcheon, L. G. Gilbreath, B. H. Monk. 1984. Evaluation of the juvenile collection and bypass system at Bonneville Dam - 1983. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-83-F-0315, 56 p.
Top of Page
1983
Krcma, R., M. H. Gessel, F. J. Ossiander. 1983. Research at McNary Dam to develop and implement a fingerling protection system for John Day Dam. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-82-F-0373, 24, 3, 5 p.
Top of Page
1982
Krcma, R., D. DeHart, M. H. Gessel, C. Long, C. W. Sims. 1982. Evaluation of submersible traveling screens, passage of juvenile salmonids through the ice and trash sluiceway, and cycling of gatewell orifice operation at the Bonneville Dam First Powerhouse, 1981. Report by Coastal Zone and Estuarine Studies Division, Northwest and Alaska Fisheries Center to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-81-F-0343, 36, [25] p.
Top of Page
1979
Krcma, R., C. Long, C. Thompson, W. Farr, T. W. Newcomb, M. H. Gessel. 1979. The development of an improved fingerling protection system for low head dams, 1978. Report by Northwest and Alaska Fisheries Center, Coastal Zone and Estuarine Studies Division to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-79-F-0163, 40 p.
Top of Page
1978
Ruehle, T. E., C. Long, M. H. Gessel. 1978. Laboratory studies of a nontraveling bar screen for guiding juvenile salmonids out of turbine intakes. Report by Northwest and Alaska Fisheries Science Center, Division of Coastal Zone and Estuarine Studies to the U.S. Army Corps of Engineers, Seattle, WA, Contract DACW57-77-F-0071, 14 p.
Top of Page
|