|
2007
|
2005
|
2004
|
2003
|
2002
|
2001
|
2000
|
1999
|
1998
|
1996
1994
|
1993
|
1990
|
1988
|
1983
|
1982
|
1980
Click the links to go to documents. Click the green arrow to see metadata.
2007
Sheridan, P., J. W. Ferguson, and S. L. Downing (editors). 2007. Report of the National
Marine Fisheries Service Workshop on Advancing Electronic Tag Technology and
Their Use in Stock Assessments. U.S. Dept. Commerce, NOAA Tech. Memo. NMFSF/
SPO-82, 82 p.
Top of Page
2005
Axel, G. A., E. F. Prentice, B. P. Sandford. 2005. PIT-tag detection system for large-diameter juvenile fish bypass pipes at Columbia River Basin hydroelectric dams. North American Journal of Fisheries Management, 25:646-651.
Top of Page
2004
Burke, B. J., T. J. Bohn, S. L. Downing, M. A. Jepson, C. Peery. 2004. Dam passage and fallback by chinook salmon and steelhead as determined by passive integrated transponder tags and radio tags. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Marine Fisheries Service, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Portland and Walla Walla Districts, Project No. ADS-00-14, vi, 58 p.
Gilbreath, L. G., E. F. Prentice, S. L. Downing. 2004. Post-construction evaluation of the juvenile bypass collection channel, transportation flume, and fish-monitoring facilities at Bonneville Dam second powerhouse, 1999-2000. Report by Fish Ecology Division, Northwest Fisheries Science Center, National Oceanic and Atmospheric Administration to the U.S. Army Corps of Engineers, Portland District, Contract W66QKZ90281485.
Top of Page
2003
Axel, G. A., E. F. Prentice, B. P. Sandford. 2003. Evaluation of a full-flow PIT-tag interrogation system at McNary Dam, 2002. Report by Fish Ecology Division. Northwest Fisheries Science Center to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV10333831, 36 p.
Downing, S. L., B. P. Sandford, G. A. Axel, E. F. Prentice. 2003. Evaluation of the TX-1400ST PIT Tag Using Juvenile and Adult Salmonids. Report to the Bonneville Power Administration, Contract 307-00001, 17 p.
Hockersmith, E. E., S. L. Downing, D. B. Dey. 2003. Post-construction evaluation of the modified PIT-tag diversion and bypass system at Little Goose Dam, 2002. Report by Fish Ecology Division. Northwest Fisheries Science Center to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV10182881, iv, 17 p.
Top of Page
2002
Nunnallee, E. P., E. F. Prentice. 2002. Development of full-flow PIT-tag interrogation systems for Snake and Columbia River dams. Report to the U.S. Army Corps of Engineers, Walla Walla District, Contract W68SBV10333831, 22 p.
Top of Page
2001
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2001. Development and evaluation of passive integrated transponder tag technology: annual report, 1999 to 2000. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Contract 307-00001, Project No. 83-319, 31 p.
Downing, S. L., E. F. Prentice, R. W. Frazier, J. E. Simonson, E. P. Nunnallee. 2001. Technology developed for diverting passive integrated transponder (PIT) tagged fish at hydroelectric dams in the Columbia River Basin. Aquacultural Engineering, 25:149-164.
Top of Page
2000
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2000. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 29 p. plus appendix.
Top of Page
1999
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. W. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system (1997-98). Report to the Bonneville Power Administration, Contract 97-AI-31168, 41 p.
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 38 p. plus appendix.
Top of Page
1998
Nunnallee, E. P., E. F. Prentice, B. F. Jonasson, W. Patten. 1998. Evaluation of a flat-plate PIT tag interrogation system at Bonneville Dam. Aquacultural Engineering, 17:261-272.
Top of Page
1996
Maynard, D. J., D. A. Frost, F. W. Waknitz, E. F. Prentice. 1996. Vulnerability of marked age-0 steelhead to a visual predator. Transactions of the American Fisheries Society, 125:330-333.
Top of Page
1994
McCutcheon, C. S., E. F. Prentice, D. L. Park. 1994. Passive monitoring of migrating adult steelhed with PIT tags. North American Journal of Fisheries Management, 14:220-223.
Peterson, N. P., E. F. Prentice, T. P. Quinn. 1994. Comparison of sequential coded wire and passive integrated transponder tags for assessing overwinter growth and survival of juvenile coho salmon. North American Journal of Fisheries Management, 14:870-873.
Prentice, E. F., D. J. Maynard, S. L. Downing, D. A. Frost, M. S. Kellett, D. A. Bruland, P. Sparks-Mcconkey, F. W. Waknitz, R. N. Iwamoto, K. W. McIntyre, N. N. Paasch. 1994. A study to determine the biological feasibility of a new fish tagging system (1990-93). Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 250 p.
Top of Page
1993
Prentice, E. F., D. J. Maynard, P. Sparks-Mcconkey, C. S. McCutcheon, D. Neff, W. Steffens, F. W. Waknitz, A. L. Jensen, L. C. Stuehrenberg, S. L. Downing, B. P. Sandford, T. W. Newcomb. 1993. A study to determine the biological feasibility of a new fish tagging system. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 182 p.
Top of Page
1990
Prentice, E. F., T. A. Flagg, C. S. McCutcheon, D. F. Brastow, D. C. Cross. 1990. Equipment, methods, and automated data entry station for PIT tagging. American Fisheries Society Symposium, 7:335-340.
Prentice, E. F., T. A. Flagg, C. S. McCutcheon. 1990. Feasibility of using implantable passive integrated transponder (PIT) tags in salmonids. American Fisheries Society Symposium, 7:317-322.
Prentice, E. F., T. A. Flagg, C. S. McCutcheon. 1990. PIT tag monitoring systems for hydroelectric dams and fish hatcheries. American Fisheries Society Symposium, 7:323-334.
Top of Page
1988
Flagg, T. A., E. F. Prentice. 1988. Status of the PIT tag system. Page 6 in Proceedings of the 38th Annual Fish Culture Conference, Tacoma, WA, 1987.
Flagg, T. A., E. F. Prentice. 1988. The PIT tag system and its suitability in sockeye salmon. Page 6 in Proceedings of the 1988 Alaska Department of Fish and Game Sockeye Culture Workshop, Ketchikan, AK.
Flagg, T. A., E. F. Prentice. 1988. Use of the PIT tag in fish migration studies. Page 1 in Proceedings of the 50th Annual Pacific Fisheries Biologists Meeting, Ocean Shores, WA.
Top of Page
1983
Flagg, T. A., E. F. Prentice, L. S. Smith. 1983. Swimming stamina and survival following direct seawater entry during parr-smolt transformation of coho salmon (Oncorhynchus kisutch). Aquaculture, 32:383-396.
Top of Page
1982
Gorbman, A., W. W. Dickhoff, J. L. Mighell, E. F. Prentice, F. W. Waknitz. 1982. Morphological indices of developmental progress in the parr-smolt coho salmon, Oncorhynchus kisutch. Aquaculture, 28:1-20.
Top of Page
1980
Damkaer, D. M., D. B. Dey, G. A. Heron, E. F. Prentice. 1980. Effects of UV-B radiation on near-surface zooplankton of Puget Sound. Oecologia, 44:149-158.
Top of Page
|