|
2001
|
2000
|
1999
|
1998
|
1997
|
1995
|
1994
Click the links to go to documents. Click the green arrow to see metadata.
2001
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2001. Development and evaluation of passive integrated transponder tag technology: annual report, 1999 to 2000. Report to the U.S. Department of Energy, Bonneville Power Administration, Division of Fish and Wildlife, Contract 307-00001, Project No. 83-319, 31 p.
Top of Page
2000
Downing, S. L., E. F. Prentice, B. W. Peterson, E. P. Nunnallee, B. F. Jonasson. 2000. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 29 p. plus appendix.
Top of Page
1999
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. W. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system (1997-98). Report to the Bonneville Power Administration, Contract 97-AI-31168, 41 p.
Prentice, E. F., S. L. Downing, E. P. Nunnallee, B. Peterson, B. F. Jonasson. 1999. A study to determine the biological feasibility of a new fish-tagging system, 1998-1999. Report to the Bonneville Power Administration, Contract DE-AI79-84BP11982, 38 p. plus appendix.
Top of Page
1998
Nunnallee, E. P., E. F. Prentice, B. F. Jonasson, W. Patten. 1998. Evaluation of a flat-plate PIT tag interrogation system at Bonneville Dam. Aquacultural Engineering, 17:261-272.
Top of Page
1997
Swan, G. A., M. B. Eppard, B. L. Iverson, M. A. Kaminski. 1997. Evaluation of the effectiveness of radio-telemetry methods to monitor passge routes of juvenile salmonids at Ice Harbor Dam, 1996. Report to the U.S. Army Corps of Engineers, Contract E86-95-0113, 33 p.
Swan, G. A., M. B. Eppard, E. E. Hockersmith, B. P. Sandford, B. L. Iverson, P. A. Ocker, M. A. Kaminski, R. N. Iwamoto. 1997. Juvenile radio-telemetry study at Ice Harbor Dam, 1995. Report to the U.S. Army Corps of Engineers, Contract E86-95-0113, 34 p.
Top of Page
1995
Stuehrenberg, L. C., G. A. Swan, L. K. Timme, P. A. Ocker, M. B. Eppard, R. N. Iwamoto, B. L. Iverson, B. P. Sandford. 1995. Migrational characteristics of adult spring, summer, and fall chinook salmon passing through reservoirs and dams of the Mid-Columbia River. Report to Mid-Columbia River Public Utility Districts, 132 p.
Top of Page
1994
Swan, G. A., L. K. Timme, R. N. Iwamoto, L. C. Stuehrenberg, E. E. Hockersmith, B. L. Iverson, B. P. Sandford. 1994. Wells Dam radio-telemetry study, 1992. Public Utility District No. 1 of Douglas County, 70 p.
Top of Page
|